WATERMARK WESTQUAY COMPLETED
The now completed first phase contains a 10-screen multiplex cinema, bowling alley, 24 restaurants and cafés, and a new public plaza and esplanade. Watermark sits adjacent to the medieval town walls, the High Street and WestQuay Shopping Centre, drawing people back to the historic waterfront. A soaring cantilevered cinema volume wrapped in a skin of curving steel tubes projects out over the new square, forming a gateway and visual signifier for guests arriving and departing from the adjacent Cruise Terminal.
MINORIES SHORTLISTED TO NLA AWARDS
Located in Aldgate, on a site with a rich historic and cultural background spanning centuries, the proposal aims at reinstate lost streets and create new urban squares and landscaping as well as three new buildings, an office block, a residential tower and a hotel. A new green courtyard is created between these three buildings, and the Paleys upon Pilers installation built for the London Festival of Architecture in 2012 will be reinstated here for public enjoyment.
CEILING COMPLETE IN VICTORIA GATE ARCADES
In the coming weeks, Leeds Victoria will get two new rooftop restaurants with great views over Kirkgate. A spiral stair and oak lined atrium connects them to the new arcade, lit from above by a sculptural ceiling. The computer generated dome design was built with 18,000 pieces of stained oak. The offset in three dimensions between the oak pieces allows daylight through and creates sensations of levity and movement, despite the weight of 4 tonnes. The continuity of oak on walls, balustrade and the domes seeks to unify walls and ceiling, to evoke the visual sensation of a tall and mysterious contemporary grotto.
BERLIN BRIDGE LIGHTING
The bridge will be seen from the S-Bahn next to Dan Flavin's light installation for the facade of the Hamburger Bahnhof, and we remain keen to find an acceptable coloured light for the bridge to complement this.
SWANSEA CENTRAL GETS PLANNING PERMISSION
Our project will re-establish a network of pedestrian streets and squares aligned to the historic character of the city. New North-South routes will create a clear and direct path from the centre to the beach, bringing the city back to its coastline at Swansea Bay.
BERLIN BRIDGE MOCK-UP
The mock-up for our footbridge over the Berlin-Spandauer Schifffahrtskanal has arrived on site. This footbridge will connect the newly developed Europacity area to the east, across the canal where the Berlin Wall separated Berlin from 1961 to 1989.
The 2m long mock-up gives a first impression of the steel work for the laser cut balustrade which forms the main structural beam of the bridge. The degree of openings of the perforation reflects the gradient of forces within the structural balustrade, more solid to the abutments, more open to its centre.
VICTORIA GATE WINS RIBA YORKSHIRE BUILDING OF THE YEAR
At last night's awards ceremony in Hull, RIBA Yorkshire awarded Victoria Gate the award for Best Building of the Year and an RIBA Regional award. It is a great honour to see a decade of work from many people at Hammerson, ACME, McAlpine and the wider design team recognized in this way.
The RIBA Yorkshire awards follows on from recent success of Victoria Gate at Mipim in Cannes where it won the award for Best International Shopping Centre and from the Irish Concrete Society where it won the award for Best International Project.
We look forward to the next award ceremony in Melbourne, Australia, where our Library and Public Square in Eastland has been shortlisted for the Victorian Architecture Awards by the Australian Institute of Architects.
LEIPZIG BANK HQ GETS PLANNING PERMISSION
LEIPZIG BANK EARTHWORKS PROGRESS
CONSTRUCTION PROGRESS MELBOURNE HOTEL
VICTORIA GATE WINS MIPIM WORLD'S BEST SHOPPING CENTRE AWARD
Hammerson, ACME and Waterman were delighted to collect the award on behalf of the entire design team which has worked incredibly hard over a period of 9 years to deliver the first new retail arcade in decades.
VICTORIA GATE WINS BEST NEW BUILDING IN LEEDS 2016
Victoria Gate Arcades has won the award for best building of 2016 at the Leeds Architecture Awards. We are delighted that the building has been recognised in this way to acknowledge all the work from a large group of dedicated people across Leeds City Council, Hammerson, Waterman Structures, Hoare Lea, Gardiner & Theobald, ACME and others.
LEIPZIG BANK CONSTRUCTION STARTED
Construction works have started on site in Leipzig for our new headquarter building for SAB. Concrete guide walls have been installed to set out the position of the diaphragm walls around the site, making the extent of the 100 m x 100 m site visible for the first time. Contaminated groundwater is expected 3m below ground level, so a watertight wall around the site has to be installed before any further works can commence.
SOUTHAMPTON OPENING
Following the soft launch of the Watermark Westquay in December last year most of the restaurants and the bowling alley at Watermark are now open. This Friday, 10th February, the project reaches another major milestone with the opening of the ten screen Cinema. From it's elevated position the foyer offers fantastic new views to the waterfront and the plaza below, between the curving stainless steel tubes of the facade.
More than 12 years have passed since the inception of the project, we can't wait to see this last key piece of the Watermark puzzle in place and the people of Southampton enjoying a new corner of the city and a stroll through the new square along the medieval city walls.