The SAB concrete frame has reached level 4. The concrete will be activated with cast-in cooling pipes, visible on the formwork tables before the concrete is poured. The emerging two wings of the building are organized around four open staircases, allowing for a fully glazed perimeter with views into the Forum and streets beyond.