SAB LEIPZIG - BANK HQ AUGUST
SAB construction of the auditorium on concrete has commenced.
The auditorium is positioned in the North-East corner and its steep rake rises from ground to first floor opening views from the 260 seats into the public space beyond. The double curvature of the seating bowl has required a high level of precision carpentry to achieve exposed concrete quality for the future foyer below.
