MINORIES CONSTRUCTION
Our Minories construction site in the Aldgate in the City of London is rapidly progressing.
The 360 bed Canopy by Hilton hotel consists of existing elements and new structures. Internal demolition of partitions has completed and the basement and ground floor transfer structures are now in place, with the new frame rising at a speed of one level per fortnight.
Construction works on the 15 story residential structure has reached the halfway point of level 7 this week with a 2 weeks turnaround per level, and should see the concrete frame topped out in January.
The 360 bed Canopy by Hilton hotel consists of existing elements and new structures. Internal demolition of partitions has completed and the basement and ground floor transfer structures are now in place, with the new frame rising at a speed of one level per fortnight.
Construction works on the 15 story residential structure has reached the halfway point of level 7 this week with a 2 weeks turnaround per level, and should see the concrete frame topped out in January.