The mock-up for our footbridge over the Berlin-Spandauer Schifffahrtskanal has arrived on site. This footbridge will connect the newly developed Europacity area to the east, across the canal where the Berlin Wall separated Berlin from 1961 to 1989.

The 2m long mock-up gives a first  impression of the steel work for the laser cut balustrade which forms the main structural beam of the bridge. The degree of openings of the perforation reflects the gradient of forces within the structural balustrade, more solid to the abutments, more open to its centre.